Sunninghill Parking and Road Safety
Earlier this year we carried out a consultation on a number of proposed improvements to parking and road safety in Sunninghill (see 'Proposal drawings' on the right). We received 418 responses and overall there was strong support for all proposals:
- Proposal to reline the car park and introduce six short stay parking bays at Upper Village Road Car Park: 327 responses in favour (88%)
- Proposal to make School Road safer for both motorists and pedestrians by installing additional parking restrictions: 359 responses in favour (85.9%)
- Proposal to remove a section of parking on the High Street opposite School Road to enable vehicles to pull in to allow vehicles to pass and to introduce additional parking restrictions: 335 responses in favour (90.1%)
- Proposal to to remove a section of parking in two areas of the High Street to enable vehicles to pass, alongside changing the existing single yellow line restrictions to double yellow lines restrictions: 313 responses in favour (74.9%)
- Proposal to formalise all the parking bays on Queen's Road, to introduce parking restrictions where it is unsafe to park and to increase the number of 2hr maximum stay bays in the car park: 362 responses in favour (86.6%)
- Proposal to introduce additional parking restrictions on Bagshot Road: 306 responses in favour (73.2%)
- Proposal to make School Road one-way from its junction with Upper Village Road and High Street, in order to ease congestion on the High Street and make access for pedestrians safer including school children: 244 responses in favour (58.4%)
As a result of the support for the proposed changes, we will be proceeding with these improvements. The changes are listed below and work will begin during the week commencing 27th October 2025:
- Changes to car park bays in Upper Village Road Car Park
- Changes to parking restrictions on School Road
- Changes to parking restrictions on High Street
- Changes to parking restrictions on Kings Road
- Changes to car park bays and parking restrictions on Queens Road
- Changes to parking restrictions on Bagshot Road
- Creation of a no entry from High Street onto School Road
The images of the works being carried out are available in the Road Improvement Works October 2025 gallery on the right.




